Pre-construction

Problems are cheapest on paper.

Pre-construction is where a project is actually won: real budgets, real schedules, soils and structure reconciled with the design, and a permit package assembled to clear review — before a single crew is mobilized.

What it covers

The work before the work.

  1. Site and soils, first

    On any slope the geotechnical report defines the buildable envelope. We commission it before drawings are finalized — designs produced first tend to get redrawn at your expense.

  2. Budget with named assumptions

    A line-item estimate whose allowances and exclusions are written down, so the number you approve is the number we manage to.

  3. Constructability review

    The builder's read of the drawings before they're priced: details that won't survive the field get resolved with the architect now, not discovered at framing.

  4. Permit strategy

    Complete submittals clear plan check; incomplete ones queue. We assemble for completeness — including hillside, coastal and fire-zone requirements.

  5. Schedule you can plan a life around

    An official timeline with the long-lead items already ordered against it. Updates arrive on a cadence, not on request.